Download our helpful installation instructions and watch our informative how to videos.
Lp smartside siding installation instructions.
Product catalog installation instructions lp smartside warranty.
For information on fastening lp smartside products in high wind speed areas refer to icc es report esr 1301 or apa pr n124.
Siding shall be face nailed 8 in.
Overlap successive courses of siding a minimum of 1.
Learn more about our engineered wood siding and trim.
As in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
Lp smartside engineered wood trim siding resists damage from impacts better than fiber cement and vinyl siding.
Common installation mistakes with lp smartside composite exterior cladding materials siding have gained more popularity over the past 20 years as they provide a high end look are paintable and more impact resistant than traditional siding materials like vinyl and aluminum.
Below window sills frieze.
How to install lp smartside trim siding.
The lp smartside portfolio.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
Do not overdrive nails.
Find product specifications warranties installation instructions and msds for all lp building solutions in our product literature resource center.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
Nail head should seat firmly to face of siding but not be overdriven to distort the siding surface.
Siding shall be installed with top blind nail placed 3 8 from each end and 3 4 in.
Shim siding at studs as needed to avoid drawing siding against uneven walls.
Siding joints shall be staggered over successive courses.
Explore color to get inspired or download the complete list.